Grid connection planning plays a central role in integrating renewable energies into the existing grid infrastructure, ensuring a secure and sustainable supply.
ContactInitially, cable route planning is carried out, where the optimal route is identified considering environmental, property, and technical factors. Special attention is paid to environmental protection and geographical conditions to minimize interference with nature while ensuring efficient and safe power transmission.
The next step involves the approval process. This includes obtaining all necessary permits for the planned cable routes. It requires close coordination with the relevant authorities to ensure that all legal requirements are met and the route is approved.
Once the permits are in place, detailed planning begins. In this phase, precise plans for the trench alignment, the depth of the cables, and the installation techniques are developed. The area of intervention is defined to ensure that there is sufficient space for construction work and the required safety clearances. These detailed plans are crucial for ensuring a smooth construction process.
After the detailed planning, construction takes place. This step includes the entire cable installation, from the excavation of the trenches to the final placement of the cables. After the installation is complete, the trenches are refilled, and the original surface is recultivated.
After completion of the construction work, the area is restored along the entire working width so that it can be used again for agricultural or other purposes. This ensures that the cable route work has no long-term negative impacts.